Online power, Danger – OnLine Power Phase Stabilizer User Manual

Page 77

Advertising
background image

OnLine Power

6002-032 REV H

4-14

4-7-5 Output Cable Installation (continued)

DANGER!!

POTENTIAL ELECTRICAL HAZARDS TO HUMAN LIFE EXIST WITHIN THIS
EQUIPMENT WHEN ENERGIZED. DISCONNECT INPUT POWER TO UNIT
BEFORE OPENING ENCLOSURE OR TOUCHING INTERNAL PARTS.

5.

Open front door of Power Island.

6.

Open hinged front panel by unbolting the three screws on the left side of panel and swinging panel to the
right.

7.

Remove rear panel by unbolting 6 screws located on the corners and right and left sides of the panel.

8.

Remove floor tiles as required.

9.

Route output cable between equipment to be powered and Power Island.

10. Pass output cable through floor opening and up into cable landing bracket.

11. Secure conduit fitting to landing bracket. Install noninsulated bushings on all conduits and flexes.

12. Route and connect the 1 to 3 power wires to output circuit breaker.

13. Route and connect the ground wire to the ground bus. See Illustration 4-7 for location of ground bus.

14. Route and connect the neutral wire to the neutral bus. See Illustration 4-7 for location of neutral bus.

15. Replace rear panel.

16. Replace hinged front panel.

Advertising
This manual is related to the following products: