Installation

NOTE

Installation may only be
undertaken by authorised
personnel.

Unit installation

1. Install the vibration absorbers

(accessories) under the system
(Figure 6

).

2. Attach the unit to the building

where structurally permitted.

3. Ensure that structure-borne

noise is not transferred to other
parts of the building.

4. Connect the medium lines.

Separating the
Transport pallet

The system is supplied with a pallet
for the purpose of transportation.
Remove this before installation.

Transport packaging

Transport pallet

Unit layout

RVS
60H

RVS
75H

RVS

100H

RVS

150H

Holediameter

14 mm

Load point A

16,5

17,5

18,5

21,5

Load point B

28,5

32,5

46,5

46,5

Load point C

11,5

13,5

31,5

33,5

Load point D

38,5

39,5

45,5

52,5

6 Weight loads

All values in kg

RVS 60H to RVS 150H

A

C

B

D

21

Advertising
This manual is related to the following products: