Installation, Installation overview – Teo E911 Response System Installation User Manual

Page 11

Advertising
background image

13-280133 Rev. C

Page 11

I

I

n

n

s

s

t

t

a

a

l

l

l

l

a

a

t

t

i

i

o

o

n

n

O

O

v

v

e

e

r

r

v

v

i

i

e

e

w

w

Refer to the illustration on page 6 for the typical installation environment. The 9145 is

connected between the PBX network and the Telco network and is typically located in the

PBX room.
The following steps must be performed before system installation is complete:

1.

Mount the 9145 in the rack.

2.

Connect the 9145 to the LAN.

3.

Connect both the PBX and Telco ISDN-PRI ports to the 9145.

4.

Configure the PBX to route calls from a test number (e.g. ‘711’) to the ISDN-PRI port.

5.

Configure the Administration PC.

6.

Connect and configure desired Reporting Devices.

7.

Connect and configure optional monitor ports.

8.

Connect AC power.

9.

Configure the 9145 to join the network domain.

10.

Initiate an administration session between the Administration PC and the 9145.

11.

Using the Administration PC, create and send valid Configuration and Station Table

data to the 9145.

12.

Verify proper operation by observing status indicators and checking for alarms.

13.

Using a test number (e.g. ‘711’), place a test call from the PBX to the system.

14.

On the Administration PC, use the Log Viewer to verify the correct calling station

number and ANI number.

15.

Configure the PBX to route 911 calls to the ISDN-PRI port.

16.

Dial ‘911’ to place a live test call to the 911 Call Taker.

17.

Communicate with the 911 Call Taker to obtain the ANI and verify voice call quality.

18.

Connect, configure and test desired Reporting Devices.

19.

Connect, configure and test optional monitor ports.

20.

Verify PBX Overflow (Alternate Routing) and remote PBX 911 call operation.

To ensure proper operation of the 9145, ALL of the above tasks must be completed

before placing the unit into operation. Make sure that the Configuration and Station

data is set up correctly prior to sending to the 9145, and perform all tests described in
the Testing section.
Ongoing administration must be performed to keep the 9145 configuration current

with any changes to the telephone system.
Teo’s liability is limited to replacement of a defective 9145 as stated in the Product
Warranty
(page 85).

I

I

I

n

n

n

s

s

s

t

t

t

a

a

a

l

l

l

l

l

l

a

a

a

t

t

t

i

i

i

o

o

o

n

n

n

Advertising