8 verify voltages on power distribution cable, 9 system test procedure, Power distribution cable voltages -3 – EFJohnson 3000 SERIES User Manual

Page 29: Pcm cable location -3

Advertising
background image

SYSTEM RACK

4-3

2. Connect the Plus lead of the Fan Cable to Bus Bar

D1-16.

3. Verify both power supplies are turned OFF.

(Power Supply "A", is located on the left side at the
bottom of the rack. Power Supply "B" is located on
the right side at the bottom of the rack.)

4. Install both power supplies.

5. Turn Power Supply "A" on.

6. Verify that the Power On indicator is "ON" for

Power Supply "A".

7. Verify that the air flow from the fan is to the outside.

4.1.8 VERIFY VOLTAGES ON POWER DISTRI-

BUTION CABLE

1. Verify voltages in Table 4-13 for the Power

Termination Cables for Shelves 1-6.

2. Turn Power Supply "A" OFF.

4.1.9 SYSTEM TEST PROCEDURE

The following test procedure is for the Switch

with six Power Termination Modules (PTMs), one
Network Interface Module (NetNIM) and one Voice
Termination Module (VTM).

1. Install all Power Termination Cables onto the back-

plane at mating connector P33.

2. Unplug all modules from the backplane card slots

(leave unplugged modules in the card guides).

3. Verify the installation of the PCM W1 and W3

cables as shown in Table 4-14 (see Figure 4-5).

Table 4-3 POWER DISTRIBUTION CABLE

VOLTAGES

Pin

Color

1

Green

-48V ±2V

2

Not Used

None

3

Black

Common

4

White

-12V ±1V

5

Not Used

None

6

Black

Common

7

Red

+5V +0.5/-0.1V

8

Not Used

+12V ±1V

9

Black

Common

10

Red

+5V +0.5/-0.1V

11

Blue

+12V ±1V

12

Black

Common

13

Red

+5V +0.5/-0.1V

14

Blue

+12V ±1V

15

Black

Common

Table 4-4 PCM CABLE LOCATION

From

To

Shelf 1 - J25
Shelf 1 - J5
Shelf 1 - J6
Shelf 1 - J23
Shelf 1 - J24

Shelf 1 - J26
Shelf 2 - J3
Shelf 2 - J4
Shelf 2 - J25
Shelf 2 - J26

Shelf 2 - J5
Shelf 2 - J6
Shelf 2 - J23
Shelf 2 - J24

Shelf 3 - J3
Shelf 3 - J4
Shelf 3 - J25
Shelf 3 - J26

Advertising