World class 3000, Instruction manual – Emerson ROSEMOUNT 3000 User Manual

Page 82

Advertising
background image

Instruction Manual

IB-106-300NH Rev. 4.3
May 2005

5-10 General User Interface (GUI) Operation

Rosemount Analytical Inc. A Division of Emerson Process Management

World Class 3000

Table 5-4. CALIBRATE O

2

Sub-Menu

SUB-MENU

SELECTION

SETUP SETTING
(SEE TABLE 3-5)

DISPLAY

DESCRIPTION

Perform
Calibration

Auto Cal in Probe
Setup is YES

Press ENTER to start Auto
Calibration.

MPS will start calibrating probe.

Starting Automatic Calibration

High Gas _____% O

2

Time Left 0:00

Value for high O

2

calibration gas.

Amount of time necessary to com-
plete the current testing phase in
min:sec.

Cell mV ______mV

Cell voltage of the probe.

Low Gas _____% O

2

Time Left 0:00

Value for low O

2

calibration gas.

Amount of time necessary to com-
plete the current testing phase in
min:sec.

Cell mV ______mV

Cell voltage of the probe.

Resistance Check
Time Left 0:00

Resistance check in progress.

Cell _____mV _____C
Calibration Complete
Purging 0:00

Cell voltage and probe temperature.

Gas lines are being purged of cali-
bration gas.

Cell _____mV _____C
Calibration Complete

Cell voltage and probe temperature.

Auto Cal in Probe
Setup is NO.

Press ENTER to start Manual
Calibration.

Manual calibration sequence will
begin when ENTER is pressed.

Switch ON high calibration gas.
Press ENTER when ready.

High gas ______% O

2

High O

2

calibration gas value.

Press ENTER when O

2

reading

is stable.

Turn OFF high calibration gas
and ON low calibration gas.
Press ENTER when ready.

Low gas ______% O

2

Low O

2

calibration gas value.

Press ENTER when O

2

reading

is stable.

Resistance Check.

Resistance check in progress.

Turn off low calibration gas.
Press ENTER when ready.

Press ENTER when probe has
returned to process.

Advertising