3-12

SPARC Enterprise M3000 Server Installation Guide • January 2009

7. At the ok prompt, type the probe-scsi-all command.

8. Confirm that the CD-RW/DVD-RW drive unit and hard disk drive installed in

the server are recognized.

9. At the ok prompt, type the show-devs command.

10. Confirm that each installed PCI card is recognized.

11. Compare the configuration shown by showhardconf -u, probe-scsi-all,

and show-devs with the product test record.

If the configuration is incorrect, contact your sales representative.

12. Press the Enter key, and then press the "#" and "." (period) keys.

This key combination switches you from the domain console (OS console) back to
the XSCF console.

3.5.2

Checking the Dual-Power Feed

For a system using the dual-power feed option, follow the procedure below to
confirm that the system can operate even if one power feed is stopped.

1. Confirm that the server is powered on.

2. Switch off the AC power supply system on the PSU#0 side.

3. Confirm that the POWER LED on the operator panel is lit.

4. From the XSCF Shell, confirm a power failure by executing the showlogs

event

command.

5. Switch on the AC power supply system on the PSU#0 side (which was switched

off in Step 2).

6. From the XSCF Shell, confirm a power recovery by executing the showlogs

event

command.

7. Confirm that the AC-LED and DC-LED on PSU#0 are lit.

8. From the XSCF Shell, confirm a Power Status is On by executing the

showhardconf

command.

9. Switch off the AC power supply system on the PSU#1 side.

10. Confirm that the POWER LED on the operator panel is lit.

11. From the XSCF Shell, confirm a power failure by executing the showlogs

event

command.