Step 2, install mounting bracket, Step 3, install duct bracket, Installation instructions – GE ZV800 User Manual

Page 10: Wall-mounted installation—vented to the outside

Advertising
background image

10

Installation Instructions

INSTALL DUCT BRACKET

The duct bracket must be intalled against the ceiling.
This bracket will hold the duct cover in place at the top.
Secure the bracket to the ceiling and wall:

Align the marked centerline on the bracket with the

centerline on the wall.

Mark the 2 screw hole locations in the ceiling.
Drill 1/8” plot holes in the marked locations.
If pilot holes do not enter studs, enlarge the holes

to 3/8” and install wall fastener anchors.

Drive screws, by hand, into the fasteners to allow

anchors to expand. Remove the screws.

Secure the bracket to the ceiling and wall with

wood screws and/or fasteners.

3

INSTALL MOUNTING BRACKET

This vent hood must be secured to the horizontal
support or wall studs.
• With the template taped in place, use a punch to

mark all mounting screw locations.

Drill 1/8” pilot holes at the 6 punched locations.
Remove the template.
The 2 holes in the support bracket holes must enter

studs or the horizontal support.

Use wood screws to secure the mounting bracket

to the wall. The screws must engage wall studs or
the installed horizontal mounting support.

Check to be sure that the bracket is level. There is

no way to level the hood after hanging it from this
bracket.

2

C

L

WALL-MOUNTED INSTALLATION—VENTED TO THE OUTSIDE

Advertising