Cabinet requirements, Ductwork, wiring, Cabinet requirements ductwork, wiring – GE ZV800 User Manual

Page 19: Installation instructions, Under-cabinet installation, Ceiling, House wiring location

Advertising
background image

19

Installation Instructions

CABINET REQUIREMENTS

This hood may be installed beneath a wall-mounted
cabinet.
If the cabinet has been installed, it must be removed

so that wall framing supports can be added.

The cabinet must be at least 20” high between the
bottom frame and the inside top. If the cabinet is not
20” from bottom to inside top, a custom cabinet or
modifications to a different size cabinet and/or soffit
may be required to accommodate the hood housing.
The cabinet must be 36” wide and at least 12” deep.
The cabinet must be firmly secured to wall studs or

the added framing support and capable of supporting
100 pounds.

UNDER-CABINET INSTALLATION

DUCTWORK, WIRING

Determine the exact location of the vent hood.
Locate the Rear Wall Template packed with the

literature.

Measure 36” from the floor to the top of the cooking

surface. Add the pre-determined hood installation
height. Mark that location.

Use a level to draw a straight pencil line on the wall.

Tape the template in position along the penciled line.

Check to be sure the template is level.

Use the level to draw a line straight up, from the

centerline on the template to the ceiling.

Measure 3-3/4” from the back wall to the centerline of

a 6-1/2” hole on the ceiling.

NOTE: If drywall is not present, add drywall thickness to
the 3-3/4” dimension.

HOUSE WIRING LOCATION:

The junction box is located on the top right side of the

hood.

Wiring should enter the back wall 20” to 26” above the

bottom of the hood, and within 4” of the right side of the
centerline. Wiring should enter at least 4” above the
right side of the frame.

19-1/2"

11-3/4"

11"

19-1/2”

11-3/4”

10-3/4”

24” Min.

20” Min.

REAR WALL TEMPLATE

C

L

49-80271 JR 07-04

Drill 1/8"
Pilot Holes

Drill 1/8"
Pilot Holes

Drill 1/8"
Pilot Holes

Drill 1/8"
Pilot Holes

Drill 1/8"
Pilot Holes

Drill 1/8"
Pilot Holes

ALIGN BOTTOM EDGE WITH

PENCIL LINE INDICATING

BOTTOM OF THE HOOD.

5-1/16"

9-5/8"

8-1/8"

2-1/16"

13-3/4"

12-3/4"

Ceiling

3-3/4” centerline

to wall

Top frame mounting

screw locations

Advertising