Step 2, install mounting bracket, Step 3, prepare the hood, Installation instructions – GE ZV800 User Manual

Page 15: Wall-mounted installation—recirculating

Advertising
background image

15

Installation Instructions

INSTALL MOUNTING BRACKET

This vent hood must be secured to the horizontal
support or wall studs.

With the template taped in place, use a punch to

mark all mounting screw locations.

Drill 1/8” pilot holes at the 6 punched locations.
Remove the template.
The 2 holes in the support bracket holes must enter

studs or the horizontal support.

Use wood screws to secure the mounting bracket to

the wall. The screws must engage wall studs or the
installed horizontal mounting support.

Check to be sure that the bracket is level.

There is no way to level the hood after hanging
it from this bracket.

2

WALL-MOUNTED INSTALLATION—RECIRCULATING

PREPARE THE HOOD

Remove the hood from the box. Remove packaging

and tape.

Remove one screw on each side of the cover on the

electrical panel. Lift off the cover and set aside with
screws.

Stand the electrical panel upright.
Align the screw holes in the bottom of the panel with

the holes on the base of the hood at the front side.

Install 3 screws provided.
Snap the damper into the

exhaust outlet on the top of
the hood.

3

Remove 2 side

cover screws

Install

damper

Electrical

panel

Secure

electrical panel

with 3 screws

Junction box

Inside screw

Advertising