Ductwork, wiring locations, Step 1, install framing for hood support, Installation instructions – GE ZV800 User Manual

Page 9: Wall-mounted installation—vented to the outside, Important, Install framing for hood support

Advertising
background image

9

INSTALL FRAMING FOR HOOD
SUPPORT

IMPORTANT

Framing must be capable of

supporting 100 lbs.

If drywall is present, mark the screw hole locations for
the top mounting brackets. Remove the template.
Cut away enough drywall to expose 2 vertical studs at

the bracket location indicated on the template.

Install a horizontal support at least 1” x 6” between

two wall studs at the top bracket installation location.
The horizontal support must be flush with the room
side of the studs.
Use cleats behind both sides of the
support to secure to wall studs.

Reinstall drywall.

1

Centerline of
Installation
Space

8" Min. Opening for Ductwork

View From Rear

Cleats

1" x 6" Min.

Mounting

Support

Installation Instructions

6” min. opening for ductwork

Centerline of

installation

space

View from rear

cleats

1” x 6” min.

mounting

support

DUCTWORK, WIRING LOCATIONS

Determine the exact location of the vent hood.

Locate the template packed with the literature.

– Measure 36” from the floor to the top of the cooking

surface. Add hood installation height determined on
page 7. Mark that location.

– Use a level to draw a straight pencil line on the wall.

– Tape the template in position along the penciled

line. CHECK TO BE SURE THE TEMPLATE IS LEVEL.

Ceiling ducting:
If ductwork will vent straight up to the ceiling:

Use a level to draw a line straight up, from the centerline

on the template to the ceiling.

Measure 3-3/4” from the back wall to the centerline of

a 6-1/2” hole on the ceiling.

NOTE: If drywall is not present, add drywall thickness to
the 3-3/4” dimension.

Wall Ducting:
If ductwork will vent to the rear:

Use a level to draw a line straight up from the centerline

on the template.

Measure at least 3-3/4” above the top mounting bracket

holes shown on the template to the centerline of a
6-1/2” dia. duct hole. (Hole may be elongated for
duct elbow.)

HOUSE WIRING LOCATION:

The junction box is located on the top right side of the

hood.

Wiring should enter the back wall 20” to 26” above the

bottom of the hood, and within 4” of the right side of the
centerline. Wiring should enter at least 4” above the
bracket on the right side.

REAR WALL TEMPLATE

C

L

49-80271 JR 07-04

Drill 1/8"
Pilot Holes

Drill 1/8"
Pilot Holes

Drill 1/8"
Pilot Holes

Drill 1/8"
Pilot Holes

Drill 1/8"
Pilot Holes

Drill 1/8"
Pilot Holes

ALIGN BOTTOM EDGE WITH

PENCIL LINE INDICATING

BOTTOM OF THE HOOD.

5-1/16"

9-5/8"

8-1/8"

2-1/16"

13-3/4"

12-3/4"

Ceiling

3-3/4” centerline to wall

6-1/2” dia. hole

FOR CEILING VENT DUCTING

Centerline 3-3/4”

min. above top

mounting bracket

holes

FOR WALL VENT DUCT

WALL-MOUNTED INSTALLATION—VENTED TO THE OUTSIDE

Advertising