Step 3, cut the opening, Step 4, install side “l” brackets, Step 5, remove side screw – GE ZV800 User Manual

Page 21: Installation instructions, Under-cabinet installation, Install side “l” brackets, Cut the opening, Remove side screw

Advertising
background image

21

Installation Instructions

INSTALL SIDE “L” BRACKETS

Install the “L” brackets onto each side of the cutout.

The wide flat portion should be on top of the opening.
Install 2 screws into the top of each bracket.

4

Install 2 screws in

each bracket

UNDER-CABINET INSTALLATION

CUT THE OPENING

If the cabinet has been installed, remove it from the wall.
Use the Top Cabinet Template to locate and cut a hole

in the bottom of the cabinet.

If necessary, place the template on top of the cabinet

to accurately cut a matching hole.

Install the cabinet onto the wall.
The cabinet must be firmly secured to the wall and be
capable of supporting 100 lbs.

INSTALL WOOD BLOCKS IF NECESSARY

Install filler blocks whenever the cabinet frame hangs

below the cabinet bottom.

Install filler blocks whenever the cabinet bottom is

less than 3/4” thick.

Install the filler blocks on each side of the cutout. The

filler blocks will accept the hood mounting screws.

NOTE: Additional filler blocks may be required along the
outside edges to accept the outside screws. See Step 5.

IMPORTANT: If filler blocks are not used, the hood may
not be secured to the cabinet.

3

Cabinet Frame.

Cabinet Bottom Shelf

Filler Block

Top of Vent

Hood

Equivalent to

Depth of Cabinet

Recess

REMOVE SIDE SCREW

The top center screw on both sides of the hood can be
used to close up any noticeable gaps at the outside
edges. See illustration.

Remove the center screw cover and screw on each

side as shown.

5

Remove screw cover

and screw

Advertising