Installation instructions, Direct connect applications, Remove junction box cover – GE AZ85H12DAC User Manual

Page 12: For 265 volt direct connect applications only, Attach conduit

Advertising
background image

REMOVE JUNCTION BOX COVER

• Remove the junction box cover by taking out the front

two screws.

1

Junction box

Installation Instructions

12

DIRECT CONNECT APPLICATIONS

FOR 265 VOLT DIRECT CONNECT

APPLICATIONS ONLY

IMPORTANT: Connection of a 265V AC product

to a branch circuit MUST be done by direct connection

in accordance with the National Electrical Code. Plugging

this unit into a building mounted exposed receptacle

is not permitted by code.

These models must be installed using the appropriate

GE power supply kit for the branch circuit amperage

and the electrical resistance heater wattage desired.

See the POWER CONNECTION CHART on page 13

to select the appropriate kit.

It is the responsibility of the installer to ensure

the connection of components is done in accordance

with electrical codes.

Direct connection to branch circuit wiring inside

the provided junction box must be made by connecting

as follows in steps 1–3 below.

ATTACH CONDUIT

• Use the round knockout hole at the top

of the junction box to install conduit coming

from the branch circuit. Install and clamp the conduit

through the conduit clamp and bring wire leads into

the junction box. Leave 8" of wire free from the end

of the conduit.

2

Conduit

FOR 230/208 VOLT DIRECT CONNECT

APPLICATIONS ONLY

Direct connection to branch circuit wiring inside

the provided junction box must be made by connecting

as follows in steps 1–3 below.

Connector

Conduit

clamp

Junction box cover

Advertising
This manual is related to the following products: