2 performing functions tests, 6 limiting the maximum flow – Moog RKP-II User Manual
Page 57

7 Operation
Performing Functions Tests
© 2010 Moog GmbH User Manual RKP-II (CA53461-001; Version 2, January 2010) 49
7.1.2.6 Limiting the Maximum Flow
Fig. 27: Limiting the Maximum Flow
7.2 Performing Functions Tests
Performing Functions
Tests
Pre-Conditions:
• Initial set-up of the pump is complete:
Ö Chap. "7.1 Initial Pump Set-Up",
Page 43
• The end caps on the through drive of the pump stages have been
removed.
• It has been assured that the pump is being supplied with operating fluid.
• The pump has been visually inspected, with particular attention given to
the lines and port connections.
Procedure:
1. Carry out the functions test in accordance with the instructions provided
by the machine / equipment manufacturer.
Pos.
Description
1
Adjustment mandrel
2
Cap nut
3
Lock nut
Displacement
V [cm
3
/R]
19
32
45
63
80
100
140
Pos.1
WS 8
WS 12
WS 10
Pos. 2
WS 24 = 40 Nm +
10 Nm
WS 32 = 80 Nm +
10 Nm
WS 27 = 80 Nm +
10 Nm
Pos. 3
WS 24 = 50 Nm +
10 Nm
WS 32 = 90 Nm +
10 Nm
WS 27 = 90 Nm +
10 Nm
ΔV for 1 mm
adjusting
screw travel
(pitch
1.5 mm/R)
3.6
5.6
6.5
8.9
11.3
11.5
Tab. 13: Adjustments Limiting the Maximum Flow
The functions tests is performed to ensure that the pump has been
installed into the machine / equipment properly.