1 start up, 2 flushing the pump – Moog RKP-II User Manual

Page 59

Advertising
background image

7 Operation

Operating the Pump

© 2010 Moog GmbH User Manual RKP-II (CA53461-001; Version 2, January 2010) 51

7.3.1 Start up

Start up

Pre-Conditions:

• Pump has been filled.

Ö Chap. "7.1.1 Filling up the Pump", Page 44

• The temperature of the operating fluid in the tank does not exceed the

pump temperature by more than 25 °C.

Procedure:

1. Start up the drive motor.

2. Check the rotational direction of the drive motor.

3. Operate the pump at low pressure until the hydraulic system has been

de-aerated.

4. For pumps with HF fluids: Run the pump for approx. one hour at low

pressure (30–50 bar).

7.3.2 Flushing the Pump

Flushing the Pump

Procedure:

1. The flushing line must be connected to the pump's lowest leakage

connection.

2. Flush the pump using operating fluid quantities depending on pump size:

If the temperature of the operating fluid in the tank exceeds the pump
temperature by more than 25 °C, the pump should only be switched on in
short intervals of 1 to 2 seconds until it has heated up.

It is forbidden to blow off the shaft seal directly with compressed-air.
It is also forbidden to spray and flush the shaft seal directly with
pressurized fluids.

If the pump is operated for longer periods of time at low pressure without
delivery (t > 15 min, p < 30 bar, Q = 0 l/min) it will be necessary to flush
the pump to dissipate the heat.

Displacement V [cm

3

/R]

19

32

45

63

80

100

140

Flushing quantity [l/min]

4–6

6–8

Tab. 14: Flushing Quantity

Advertising