Section 7 − setting sequence parameters, 1. sequence parameters in a program, Section 8 − setting dual schedule parameters – Miller Electric PipePro Dual User Manual

Page 33: 1. optional dual schedule switch diagrams

Advertising
background image

OM-230 009 Page 29

SECTION 7 − SETTING SEQUENCE PARAMETERS

7-1. Sequence Parameters In A Program

.

For more information on
Sequence Push Button see

Section 6-11.

If time is set to zero in Weld

sequence, welding continues until

gun trigger is released.
If time is set to zero in any timed

sequence except Weld, the

sequence is skipped.

Trigger

Pressed

Trigger

Released

Time

Start

Time

Preflow

Weld Time

Crater

Time

Postflow

Start

Burnback

Time

Time

Time

Postflow

Crater

Weld

Run-In

Preflow

Burnback

Sequence

End

Volts

IPM

Seconds

4. Weld

5. Crater
6. Burnback

7. Postflow

2. Run-In

0-100.0

0-5.00
0-0.25

0-9.9

X

X

X
X

X

X = Setting available.

3. Start

0.00-5.00

X

X

1. Preflow

0-9.9

Sequence

Parameters

X

SECTION 8 − SETTING DUAL SCHEDULE PARAMETERS

8-1. Optional Dual Schedule Switch Diagrams

.

A DSS-8 will not function with
trigger hold and dual schedule.

A DSS-9 is recommended for

this application.

1

2

3

4

B

A

TR

1

1

2

2

3

A

4

B

Dual Schedule With DSS-8

(Maintained Contact)

Dual Schedule With DSS-9

(Maintained Contact)

Advertising