Vent installation – Monessen Hearth Direct Vent Gas Fireplace KHLDV SERIES User Manual

Page 22

Advertising
background image

22

73D0024

ROOF PITCH

H (feet)

Flat to 6/12

1.0

Over 6/12 to 7/12

1.25

Over 7/12 to 8/12

1.5

Over 8/12 to 9/12

2.0

Over 9/12 to 10/12

2.5

Over 10/12 to 11/12

3.25

Over 11/12 to 12/12

4.0

*H = Minimum height from roof to lowest

discharge oopening of vent.

VENT INSTALLATION

3. Cut a hole in the roof using the locating hole as a center point. (Cover any exposed open vent pipes before cutting hole

in roof). The 10

1

/

2

"x10

1/2

" (241mm x 241mm) hole must be measured on the horizontal. Actual length may be larger

depending on the pitch of the roof. There must be a 1" minimum clearance from the vent pipe to combustible materials.
(Insulation should be considered a combustible material).

4. Connect a section of pipe and extend up through the hole.

NOTE: If an offset is needed to avoid obstructions, you must support the vent pipe every three (3) feet.
Use wall straps for this purpose. See Figure 18, page 19. Whenever possible, use 45° elbows instead of
90° elbows. The 45° elbow offers less restriction to the fl ow of the fl ue gases and intake air.

5. Place the flashing over the pipe section(s) extending through the roof. Secure the base of the flashing to the roof and

framing with roofing nails. Be sure roofing material overlaps the top edge of the flashing. There must be a 1" clearance
from the vent pipe to combustible materials.

6. Continue to add pipe sections until the height of the vent cap meets the minimum building code requirements.

NOTE: You must increase vent height for steep roof pitches. Nearby trees, adjoining roof lines, steep
pitched roofs, and other similar factors may cause poor draft or down-drafting in high winds. Increasing
the vent height may solve this problem.

NOTE: If the vent pipe passes through any occupied areas above the fi rst fl oor, including storage spaces
and closets, you must enclose pipe. You may frame and sheetrock the enclosure with standard construction
material. Make sure to meet the minimum allowable clearances to combustibles. Do not fi ll any of the
required clearance spaces with insulation.

TERMINATION HEIGHTS FOR VENTS ABOVE FLAT OR SLOPED ROOFS