Section 3 − installation, 1. specifications, 2. duty cycle and overheating – Miller Electric Invision 456MP User Manual

Page 15

Advertising
background image

OM-193 267 Page 11

SECTION 3 − INSTALLATION

3-1. Specifications

Input

Power

Rated Welding

Output

Voltage

Range

Maximum

Open-

Circuit

Voltage

Amperes Input At Rated

Load Output 60 Hz,

Three-Phase

KVA

KW

Power

Output

Range

Voltage

DC

230 V

460 V

575 V

230/460

575

230/460

575

Three

Phase

450 A @ 38 Volts DC,

100% Duty Cycle;

565 A @ 43 Volts DC,

60% Duty Cycle

10 − 38

95

50.8

(0.14*)

27.8

(0.09*)

24.4

(0.12*)

21.2

(0.06*)

24.3

(0.12*)

19.2

(0.04*)

19.0

(0.07*)

*While idling

3-2. Duty Cycle and Overheating

Duty Cycle is percentage of 10 min-

utes that unit can weld at rated load

without overheating.
If unit overheats, thermostat(s)

opens, output stops, and cooling

fan runs. Wait fifteen minutes for

unit to cool. Reduce amperage or

duty cycle before welding.
NOTICE − Exceeding duty cycle

can damage unit and void warranty.

Overheating

0

15

A/V

OR

Reduce Duty Cycle

Minutes

duty1 4/95 − SA-181 560

Continuous Welding

100% Duty Cycle At 450 Amperes

60% Duty Cycle At 565 Amperes

6 Minutes Welding

4 Minutes Resting

Advertising