Section 6 − maintenance and troubleshooting, 1. routine maintenance, 2. blowing out inside of unit – Miller Electric Invision 456MP User Manual

Page 39

Advertising
background image

OM-193 267 Page 35

SECTION 6 − MAINTENANCE AND TROUBLESHOOTING

!

Disconnect power

before maintaining.

.

Maintain more often
during severe conditions.

6-1. Routine Maintenance

3 Months

Replace

damaged or

unreadable

label.

Repair or

replace

cracked

cables.

Replace

cracked

torch body.

Repair or

replace cracked

cables and cords.

6 Months

Clean and

tighten weld

terminals.

Blow out

inside.

6-2. Blowing Out Inside of Unit

!

Do not remove case when

blowing out inside of unit.

To blow out unit, direct airflow

through front and back louvers as

shown.

802 314

Advertising