Finishing up, Warning – Intel SHG2 User Manual

Page 39

Advertising
background image

Server Board installation

39

Finishing Up

WARNING

An electrical shock hazard exists if the chassis cover is not replaced
before connecting the chassis AC power.

1. Install the chassis cover according to the instructions for your chassis.
2. See your chassis documentation to complete rack or pedestal installation.
3. Connect the keyboard, mouse and monitor cables to the back panel.
4. Connect the power cable to the back panel and to an AC outlet.

OM14358

NIC2

(Gbit)

NIC1

(10/100)

A

B

C

E

D

F

G

H

J

K

I

A AC Power*

G Video

B USB 1,2, 3

H NIC2 (Gbit)

C Mouse

I NIC1 (10/100)

D Keyboard

J ICMB/External SCSI Connector Knockout*

E Parallel Port

K Serial B Knockout*

F Serial A

* Intel SC5200 Base chassis shown here. Item may be different on your chassis.

Figure 25. Making Back Panel Connections

Advertising