2 comparison of migration methods, 1 host operating system-based migration – IBM TotalStorage DS6000 Series User Manual

Page 315

Advertising
background image

Chapter 15. Data migration in the open systems environment

291

Once it is decided which method (or methods) to use, the migration process starts with a very
careful planning phase. Items to be taken into account during migration planning include:

Availability of all the required hardware and software.

Installation of the new and removal of the old storage.

Installation of drivers required for the new storage.

A test of the new environment.

The storage configuration before, during, and after the migration.

The time schedule of the whole process, including the scheduling of outages.

Does everyone involved have the necessary skills to perform their tasks?

Additional information about data migration to the DS6000 can be found in the DS6000
Introduction and Planning Guide

, GC26-7679 at:

http://www-1.ibm.com/servers/storage/disk/ds6000/pdf/DS6000_planning_guide.pdf

Exceptional care must be exercised in data sharing (clustered) environments. If data is
shared between more than one host, all of them have to be made aware of the changes in the
configuration, even if the migration is only performed by one of them. Refer to the
documentation of your clustering solution for ways to propagate configuration changes
throughout the cluster.

15.2 Comparison of migration methods

There are numerous methods that can be used to migrate data from one storage system to
another. We briefly describe the most common ones and list their advantages and
disadvantages in the following sections.

15.2.1 Host operating system-based migration

Data migration using tools that come with the host operating system has these advantages:

No additional cost for software or hardware.

System administrators are used to using the tools.

Reasons against using these methods could include:

Different methods are necessary for different data types and operating systems.

Note:

When discussing disruptiveness, we don't consider any interruptions that may be

caused by adding the new DS6000 LUNs to the host and later by removing the old storage.
They vary too much from operating system to operating system, even from version to
version. However, they have to be taken into account, too.

Note:

IBM Global Services can assist you in all phases of the migration process with

professional skill and methods.

Note:

The IBM iSeries platform with the OS/400 and i5/OS operating systems has a

different approach to data management than the other open systems. Therefore different
strategies for data migration apply. Refer to Appendix B, “Using the DS6000 with iSeries”
on page 329
.

Advertising