7 front panel, Front panel, Figure 2-15 – IBM TotalStorage DS6000 Series User Manual

Page 61

Advertising
background image

Chapter 2. Components

37

these cables are pictured in orange and green (which appear darker if viewed in black and
white). In each case cables run from the

disk contrl

ports to the

in

ports of the SBOD card. A

second expansion enclosure has been added by running cables from the

out

ports on the first

expansion enclosure to the

in

ports on the second expansion enclosure. At the bottom of the

diagram, dotted lines indicate the potential cabling to add more expansion enclosures to that
loop

Figure 2-15 Expansion enclosure cabling (Disk Contrl ports on loop 1)

2.7 Front panel

The DS6000 front operator panel allows you to perform a health check with a single glance.
There are 7 indicators present on the panel; they are depicted in Figure 2-16.

Figure 2-16 DS6000 front panel

Cables attach to
server enclosure
disk contrl ports

First expansion
enclosure on loop 1
(first enclosure
on loop)

Second expansion
enclosure on loop 1
(second enclosure
on loop)

System information

System alert

Data in cache on battery

System power

System identify

CRU fault on rear

Fault in expansion enclosure

Advertising