Implement gps offsets, Receiver installation – John Deere OMPFP10808 User Manual

Page 23

Advertising
background image

Setup

CZ76372,00001D0 ­19­06OCT10­1/1

CZ76372,00001D1 ­19­06OCT10­1/1

Implement GPS Offsets

Press GPS OFFSET button on Implement Setup screen.
This button will only be active if an implement GPS
receiver is connected to the CAN Bus.

Enter Implement GPS Offsets:

IMPORTANT: Drive a vehicle forward and have

the vehicle & implement in a straight line
before measuring and calculating these
dimensions. This is very important for
accurate measurements.

IMPORTANT: Values must be accurate because

they will be used to calculate the track for
implement guidance and documentation.

NOTE: Minor adjustments to dimension B on the

Implement 1 GPS Offsets page can result in
measurable changes in off­track error performance.
When modifying this value, minor increment
changes 1 cm (0.5 in.) is recommended.

There are certain value constraints to make iGuide work ­
refer to APPENDIX—VALID CONFIGURATION.

PC1

1841

—UN—23MAR09

GPS Offsets

A—In­line distance from

connection point to GPS
receiver.

B—Lateral distance from

implement center to GPS
receiver.

C—Vertical distance from GPS

receiver to ground with
implement engaged.

D—Lateral offset toggle button
E—Verify implement fore/aft

and offsets in the StarFire
setup pages.

Measuring in line dimension from receiver
to receiver

Measure the distance between the vehicle receiver to
the implement receiver and then compare to the total
of dimensions "B" and "C" from Machine Offsets Page
(section 15­5), and dimension "A" from the Implement
GPS Offsets Page (section 15­ 10). The physical distance
between the receivers should match the distance found in
adding these three dimensions.

Example:

Distance between vehicle and implement receivers =
255 inches

Dimensions "B" in Vehicle offset page = 55, "C" in
Vehicle offset page = 65, and "A" in Implement receiver
offset page = 135 in. In total equaling, 255 inches.

NOTE: Measure from middle of vehicle receiver to

middle of implement receiver.

NOTE: For articulated tractors, the distance from

receiver to connection point is B subtracted from
C. (i.e. distance = "C" ­ "B" + "A")

15­10

102110

PN=23

Advertising