J-400 series, Page 13, Figure b 60hz terminal block connection – Jacuzzi J - 470 User Manual

Page 19: Electrical fitting and conduit must be installed

Advertising
background image

Page 13

J-400 Series

Figure b

60hz terminal block Connection

L2

L1

1. Main Terminal Block
2. Bonding Lug/Grounding Terminal
3. Power wires Entrance (Electrical fitting and conduit must be

installed)

Figure C

Terminal Connection

(north american 240 VaC Connection shown)

*

Electrical fitting and conduit must be installed

BLK

RED

Power In

*

Green

Power In

*

Main

Terminal

Block

Use screwdriver

to pry open

the connector

Insert power

wires and

secure connection

L2

L1

L2

L1

BLK

RED

Power In

*

Green

L2

L1

Main

Terminal

Block

Grounding

Lug

2

1

3

Advertising
This manual is related to the following products: