6 programming the secondary filter cycle, J-400 series, Page 65 – Jacuzzi J - 470 User Manual

Page 71: Figure d figure e, Figure f, Figure g

Advertising
background image

Page 65

J-400 Series

13.6 Programming the secondary Filter Cycle

1. To program the Secondary Filter

cycle, press button C. This cycle

will activate the main jet pump to

run for additional filtration when

programmed. If you choose not to

use this feature, please skip this

section.

2. When you enter the Secondary Filter

Cycle submenu, the “Day Settings”

will be highlighted (Figure E). From

this menu, you can set the say, time,

and duration. Press the Splash

button on the Quad keypad to

confirm selection.

3. You can choose the day(s) you would

like to run a secondary filter cycle.

Press the Up or Down button on the

Quad keypad to scroll through and

change the days you would like the

filtration to run. Press the Left or

Right button to turn on (

) or off

the filtration for that day.

4. Press the Splash button to save settings.

5. Press button D on the Quad Keypad to return to the submenu to

continue programming the start time and duration (Figure E).

6. Press the Down button on the Quad

Keypad to highlight “Start Time”

(Figure G). Press the Left or Right

button on the Quad Keypad to select

the time you wish the spa to filter.

Press the Down button to save
settings.

note: If you are using a standard 12-
hour period, you will see the hour displayed as “1PM”. For the
24-hour period it will read “1300”.

Primary
Secondary
Heating

Press to

reset to default

SETTINGS 2

OFF

Figure D

Figure E

SECONDARY

Start Time

Day Settings

Duration

Select

Day Settings

Press to enter

SECONDARY

Select

Tuesday
Wednesday

Thursday

Friday

Saturday

Sunday

Press to enter

Monday

OFF

OFF
OFF

OFF

OFF

OFF

OFF

Figure F

SECONDARY

Start Time

Day Settings

Duration

Press to save

Select

Start Time

1AM

Figure G

Advertising
This manual is related to the following products: