0 typical spa wiring diagrams, J-400 series, Page 79 – Jacuzzi J - 470 User Manual

Page 85

Advertising
background image

Page 79

J-400 Series

Red (L2)

Pigtail

Neutral Bus

Ground

Black (L1)

Green

Main

Service

Panel

with

GFCI

2-Pole

GFCI

Breaker

Ground/Bonding Lug**

2-Pole Circuit Breaker with 2-Wire Grounded Load Connection

(3 Wires to Hot Tub, 2-Hot (L1-L2), 1-Ground)

White (N)

Black (L1)

Red (L2)

240 VAC

No Load Neutral Wire

Note: service disconnect not

shown in this diagram.

The control box TB1 terminal

position varies between models.

Red (L2)

Red (L2)

Pigtail

Neutral Bus

Ground

Black (L1)

Black (L1)

Green

GFCI Sub Panel*

Main Panel*

2-Pole

GFCI

Breaker

Ground/Bonding Lug**

No Load Neutral Wire

Main Panel with Secondary GFCI Shut-Off Box Using a

2-Pole GFCI Breaker with 2-Wire Grounded Connection

(3 Wires to Hot Tub, 2-Hot (L1-L2), 1-Ground)

White (N)
Green (Ground)

*GFCI Sub Panel commonly

used when recommended GFCI

does not install in Main Panel.

Note: service disconnect not

shown in this diagram.

The control box TB1 terminal

position varies between models.

B

A

240 VAC

18.0 Typical spa wiring Diagrams

18.1 wiring diagram for north american 60 Hz models Only

Advertising
This manual is related to the following products: