Installation, Overview, Overview 15 – Siemens DataNET Hub (DNH) User Manual

Page 23: On 15, Chapter 2

Advertising
background image

2000585-001

Installation

•••• 15

Chapter 2

Installation

Overview

This chapter is intended for installation personnel. After completing the
procedures in this chapter the Advance DataNET Hub (DNH) will be
ready for operation. To ensure a safe and trouble free installation, follow
all procedures and associated advisory information.

Ensure that all AC Power (Mains) Specification requirements and adviso-
ries are met. Failure to do so, and operating the equipment in a manner
not specified, may impair the safety protection provided by the equip-
ment.

Before beginning the installation process read through this Chapter to
familiarize yourself with the installations requirements. This will aid you to
ensure a safe and trouble free installation.

Topic

See Page

Unpacking and Inspection

16

Wall or Rack Mounting Installation

17

Site Wiring Requirements

19

CE Installations

23

Wiring Connections

25

AC Power (Mains) Connections

26

DataNET Copper Connections

29

DataNET Hub Signal Equalizer Board

34

Hub Signal Equalizer Board with Generic Cable

37

DataNET Fiber Optic Connections

42

Ethernet Connections

45

Introduction

WARNING

Installation Overview

Advertising