Siemens DataNET Hub (DNH) User Manual

Page 47

Advertising
background image

2000585-001

Installation

•••• 39

Signal Equalizer Settings for Non Recommended Cable or Unknown
Cable Lengths,

Continued

This procedure is for determining the DataNET Signal Equalizer Board
settings for other than the recommended cable or if the cable run lengths
are unknown.

Step Action

1.

To determine appropriate settings for attenuator boards, be-
gin by measuring signal levels at the various ports (use either
Option 1 or 2).

Important

The cables should be removed from all but one port at a time.
This allows the one connected port to come on line and oper-
ate, thus allowing measurement of signal level.

2.

Sequentially go through the ports, and measure and record
the signal level of the response

Example:

Port #

Signal Level

1

1.6 v p-p

2

1.75 v p-p

4

1.25 v p-p

6

4.8 v p-p

8

4.5 v p-p

Instructions &
Examples

Advertising