Site wiring requirements – Siemens DataNET Hub (DNH) User Manual

Page 27

Advertising
background image

2000585-001

Installation

•••• 19

Site Wiring Requirements

How you wire to the DNH is dependent upon the site requirements:

• CE (Conformite Europeene) Certified Areas

• NEC Division 2 or Non-Hazardous Areas

• Cenelec Zone 1 or Zone 2 Areas

• Rack Mounting Non-Hazardous Area

The installation should have a power disconnect external to HUB enclo-
sure.

No voltage dependent selections need to be made on the HUB power
supply, as it has a universal input.

See Page 23, CE Installations.

Use Metal Conduit wiring method.

Conductor type: Power cable sized for circuit protection chosen.

Use Cable Gland wiring method:

Conductor type: Power cable sized for circuit protection chosen, and
must be shielded.

Use Metal Conduit wiring method.

Conductor type: Power cable sized for circuit protection chosen.

Description

Wiring of Power to
DataNET HUB

CE Installations

NEC Div 1, Div 2 or Non
Rated Areas

Cenelec Zone 1 or Zone 2
Rated Areas

Non Rated Areas or Rack
Mounting

Advertising