(3) Do a leak test of all joints of the tubing (both indoor and

outdoor) and both gas tube and liquid tube service

valves. Bubbles indicate a leak. Wipe off the soap with a

clean cloth after the leak test.

(4) After the system is found to be free of leaks, relieve the

nitrogen pressure by loosening the charge hose

connector at the nitrogen cylinder. When the system

pressure is reduced to normal, disconnect the hose from

the cylinder.

Evacuation

(1) Attach the charge hose end described in the preceding

steps to the vacuum pump to evacuate the tubing and

indoor unit. Confirm that the “Lo” knob of the manifold

valve is open. Then, run the vacuum pump. The

operation time for evacuation varies with the tubing

length and capacity of the pump. The following table

shows the amount of time for evacuation:

The required time in the above table is calculated based on

the assumption that the ideal (or target) vacuum condition is

less than –14.7 psig (–755 mmHg, 5 Torr).

(2) When the desired vacuum is reached, close the “Lo”

knob of the manifold valve and turn off the vacuum pump.

Confirm that the gauge pressure is under –14.7 psig

(–755 mmHg, 5 Torr) after 4 to 5 minutes of vacuum

pump operation.

NOTE

Required time for evacuation

when 30 gal/h vacuum pump is used

If tubing length is

If tubing length is

less than 49 ft.

longer than 49 ft.

45 min. or more

90 min. or more

Manifold valve

Pressure
gauge

Lo

Hi

Vacuum pump

Outdoor unit

Liquid
tube

Gas
tube

Close

Open

Close

Open

Service port ø5/16"

Fig. 7-4