LG A3UH363FA0 User Manual

Page 23

Advertising
background image

Service Manual 23

Flaring Work and Connection of Piping

4. Indoor unit installation

Hook the indoor unit onto the upper portion of the installa-
tion plate.(Engage the two hooks of the rear top of the
indoor unit with the upper edge of the installation plate.)
Ensure that the hooks are properly seated on the installa-
tion plate by moving it left and right.

Press the lower left and right sides of the unit against the
installation plate until the hooks engage into their
slots(clicking sound).

Connecting the piping to the indoor unit and drain hose
to drain pipe.

1. Align the center of the pipes and sufficiently tighten the

flare nut by hand.

2. Tighten the flare nut with a wrench.

3. When extending the drain hose at the indoor unit, install

the drain pipe.

Wrap the insulation material around the connecting por-
tion.

1. Overlap the connection pipe insulation material and the

indoor unit pipe insulation material. Bind them together
with vinyl tape so that there may be no gap.

2. Wrap the area which accommodates the rear piping hous-

ing section with vinyl tape.

3. Bundle the piping and drain hose together by wrapping

them with vinyl tape for enough to cover where they fit into
the rear piping housing section.

Drain hose

Connecting

cable

Indoor unit tubing

Flare nut

Pipes

Wrench

Indoor unit tubing

Open-end wrench (fixed)

Connection pipe

Flare nut

Vinyl tape(narrow)

Adhesive

Drain pipe

Indoor unit drain hose

Plastic bands

Insulation material

Vinyl tape(narrow)

Connection pipe

Connecting cable

Vinyl tape (wide)

Wrap with vinyl tape

Indoor unit pipe

Pipe

Wrap with vinyl tape

Drain hose

Pipe

Vinyl tape(wide)

mm

inch

kg.m

Ш6.35

1/4

1.8

Ш9.52

3/8

4.2

Outside diameter

Torque

Advertising
This manual is related to the following products: