Evacuation – LG A3UH363FA0 User Manual

Page 37

Advertising
background image

Service Manual 37

Checking the Drainage, Forming the Pipings and Long Pipe Setting

1. Connect the charge hose end described in the preceding

steps to the vacuum pump to evacuate the tubing and
indoor unit.
Confirm the "Lo" knob of the manifold valve is open. Then,
run the vacuum pump.
The operation time for evacuation varies with tubing length
and capacity of the pump. The following table shows the
time required for evacuation.

2. When the desired vacuum is reached, close the "Lo" knob

of the manifold valve and stop the vacuum pump.

Finishing the job

1. With a service valve wrench, turn the valve stem of liquid

side valve counter-clockwise to fully open the valve.

2. Turn the valve stem of gas side valve counter-clockwise to

fully open the valve.

3. Loosen the charge hose connected to the gas side service

port slightly to release the pressure, then remove the hose.

4. Replace the flare nut and its bonnet on the gas side ser-

vice port and fasten the flare nut securely with an
adjustable wrench. This process is very important to pre-
vent leakage from the system.

5. Replace the valve caps at both gas and liquid side service

valves and fasten them tight.

This completes air purging with a vacuum pump.

The air conditioner is now ready for test running.

: Repeat evacuation procedure for each indoor

unit.

NOTICE

Required time for evacuation when 30 gal/h vacuum

pump is used

10 min. or more

15 min. or more

If tubing length is less

than 10m (33 ft)

If tubing length is longer

than 10m (33 ft)

Indoor unit

Outdoor unit

Lo

Hi

Manifold valve

Vacuum pump

Pressure
gauge

Open

Close

Evacuation

Advertising
This manual is related to the following products: