Nortel Networks CALLPILOT 555-7101-215 User Manual
Page 35
Advertising
May 2003
Preinstallation requirements
Part 2: 702t Server Hardware Installation
35
4 Review the slot locations (see “Rear panel diagram” on page 13).
5 Do one of the following:
IF THEN
you observe any damage
contact your Nortel Networks technical
support representative.
components have become
loose
secure them. Then replace the server
cover and proceed with the hardware
installation.
Refer to the procedures in Part 5 of the
CallPilot Installation and Configuration
binder.
you are satisfied that the
702t server has arrived
at your site undamaged
replace the server cover and proceed with
the hardware installation.
Advertising