Toshiba Carrier RAV-SP180UT-UL EN User Manual

Page 11

Advertising
background image

Toshiba

– 10 –

4-way Air Discharge Cassette Type

Installation Manual

EN

„

Opening a ceiling and
installation of hanging bolts

• Consider the piping/wiring after the unit is hung when

determining the location of the indoor unit installation
and orientation.

• After the location of the indoor unit installation has

been determined, open the ceiling and install
hanging bolts.

• The dimensions of the ceiling opening and hanging

bolt pitches are given in the outline drawing and the
attached installation pattern.

• When a ceiling already exists, lay the drain pipe,

refrigerant pipe, system interconnection wires, and
remote control wires to their connection locations
before hanging the indoor unit.

Procure hanging bolts and nuts for installing the indoor
unit (these are not supplied).

Using the installation pattern (accessory)

The installation pattern is provided inside the
packaging cap.

<For existing ceiling>

Use the installation pattern positioning a ceiling
opening and hanging bolts.

<For new ceiling>

Use the installation pattern to position the ceiling
opening when hanging a ceiling.
• After the hanging bolts have been installed, install

the indoor unit.

• Hook the four holes in the installation pattern to the

panel fixing screws of the indoor unit.

• When hanging a ceiling, open the ceiling along the

outside dimensions of the installation pattern.

Treatment of ceiling

The ceiling differs according to structure of building.
For details, consult your constructor or interior finish
contractor.
In the process after the ceiling board has been
removed, it is important to reinforce ceiling foundation
(frame) and to keep horizontal level of installed ceiling
correctly in order to prevent vibration of ceiling board.
(1) Cut and remove the ceiling foundation.
(2) Reinforce the cut surface of ceiling foundation, and

add ceiling foundation for fixing the end of ceiling
board.

Installation of hanging bolt

Use 3/8” (M10) hanging bolts (4 pcs, to be local
procure). Matching to the existing structure, set pitch
according to size in the unit external view as shown
below.

Installation of ceiling opening and hanging
bolt

Hanging bolt

3/8" (M10)

4 pieces

Nut

3/8" (M10)

12 pieces

Indoor unit

Panel fixing

screw

Installation pattern (Accessory)

hole

New concrete slab

Install the bolts with insert brackets or anchor bolts.

Steel flame structure

Use existing angles or install new support angles.

Existing concrete slab

Use a hole-in anchors, hole-in plugs, or a hole-in bolts.

Rubber

Anchor bolt

(Blade type

bracket)

(Slide type

bracket)

(Pipe hanging

anchor bolt)

Hanging bolt

Hanging bolt Support angle

Hanging bolt

Level

Hanging bracket

10-EN

+00EH99864701_00Ta.book Page 10 Tuesday, November 24, 2009 4:54 PM

Advertising