Separation/installation and moving of the options – Toshiba E-STUDIO 850 User Manual

Page 270

Advertising
background image

268

9.BLINKING GRAPHIC SYMBOLS

4.Jam Symbols (Cont.)

9

Separation/Installation and moving of the options

Perform the following procedure to separate, install and move the finishing device (including the Hole
Punch Unit and Inserter Unit) and the External Large Capacity Feeder when clearing the jam.

When installing the options, be careful not to let your fingers be caught between the equipment and the
optional unit.

Separating/Installing and moving the finishing device
When separating the finishing device from the equipment:
While placing your hand (position A) and pressing the button, gently move the finishing device away
from the equipment.

When installing the finishing device to the equipment:
While placing your hand (position A) and pressing the button, gently install the finishing device.

A

A

Advertising