Installation of indoor unit, Ceiling opening and installation of hanging bolts, How to use the supplied installation pattern – Toshiba MMU-AP0071MH User Manual

Page 10: Installation of hanging bolt

Advertising
background image

7

Ceiling opening and installation of hanging bolts

• Evaluate and determine the piping and wiring requirements inside the ceiling prior to the hanging of the unit.

• After installation place of the indoor unit has been determined, create opening in ceiling and install the hanging

bolts.

• For the ceiling opening size and pitch for hanging bolts refer to the dimensional drawing and the supplied

installation pattern.

• Once the ceiling void has been created, ensure that the drain pipe, refrigerant pipes, inter-connecting wires and all

control wires are in place prior to installing the actual indoor unit.

Please procure the hanging bolts and nuts for
installation of the indoor unit at local site.

How to use the supplied installation pattern

The installation pattern is enclosed within the packaging of the air conditioner.

Existing ceiling void

Use the pattern to determine the position and size of the opening and location of the hanging bolts.

Opening a ceiling and installation of hanging bolts

Treatment of ceiling

The ceiling differs according to the structure of the building. For details, consult your architect.

In the process after the ceiling panels have been removed, it is important to reinforce the ceiling construction and
ensure the ceiling remains in a horizontal position. This is to prevent possible vibration of the ceiling panels.

1. Cut and remove the ceiling material.

2. Reinforce the cut surface of the ceiling construction and add support for fixing the end of ceiling panel.

Installation of hanging bolt

Use M10 hanging bolts (4 off, locally procured).

When mounting the unit, set the pitch of the hanging bolts according to the size of the unit as detailed on the
dimensional drawing.

M5 × 16L screws (Attached)
These screws are exclusive to the
installation pattern. When installing
the ceiling panel, the other exclusive
screws attached to the ceiling panel
(sold separately) are used.)

Indoor unit

Installation pattern
(Attached)

Cut off the installation
pattern along slit of
the main unit.

3

INSTALLATION OF INDOOR UNIT

Hanging bolt

Nut

M10 or W3/8

M10 or W3/8

4 pieces

12 pieces

New ceiling void

Use the pattern to determine the position of the new ceiling opening.

Cut off slit section of the main unit of the installation pattern.
Cut off the outside of the pattern according to size of the ceiling
opening. (There is a slit on the standard opening size section.)

• Install the indoor unit after installation of the hanging bolts.

• Using the supplied pattern attach it to the indoor unit using the

supplied fixing screws (M5 × 16L 4off). (Screw pattern to the ceiling
panel hanging brackets of the indoor unit)

• When creating the opening ensure it is as per the outer dimensions

of the supplied pattern.

New concrete slab

Install the bolts with insert brackets or anchor
bolts.

Steel flame structure

Use existing angles or install new
support angles.

Existing concrete slab

Use a hole-in anchors, hole-in
plugs, or a hole-in bolts.

Anchor bolt

(Blade type

bracket)

(Slide type

bracket)

(Pipe hanging

anchor bolt)

Reinforcing

steel

Hanging bolt

Hanging bolt

Support angle

Advertising