Hardware installation and initial setup, Front panel leds of the p650, Chapter 2 hardware installation and initial setup – ZyXEL Communications Prestige 650 User Manual

Page 31: 1 front panel leds of the p650

Advertising
background image

Prestige 650 ADSL Router

Hardware Installation and Initial Setup

2-1

Chapter 2

Hardware Installation and Initial Setup

This chapter describes the physical features of the Prestige and how to make cable connections

.

2.1 Front Panel LEDs of the P650

The LEDs on the front panel indicate the operational status of your Prestige

Figure 2-1 Prestige 650 Front Panel

Table 2-1 Front Panel LED Description

LED COLOR STATUS

DESCRIPTION

On

The Prestige is receiving power.

Blinking

The Prestige is performing a self-test.

PWR Green

Off

The Prestige is not receiving power.

On

The Prestige is functioning properly.

Blinking

The Prestige is rebooting.

Green

Off

The system is not ready or has malfunctioned.

SYS

Orange

On

Power gasp action. Power to the Prestige is too low.

On

The Prestige has a successful 10Mb Ethernet connection.

Blinking

The Prestige is sending/receiving data.

LAN
10M

Green

Off

The Prestige does not have 10Mb Ethernet connection.

Advertising