Xantrex Technology GT5.0-NA User Manual

Page 82

Advertising
background image

Index

IX–2

975-0320-01-01

configuration

2–1

messages in normal operation

5–5

messages in offline mode

5–6

O

operation

factors affecting performance

6–1

inverter startup

4–3

messages at startup

5–2

reassembling the unit

4–2

startup procedure

4–1

P

parallel configuration

communication between inverters

3–12

communications wiring

3–15

power derating

A–4

proof of purchase

WA–4

purchase date

WA–4

PV arrays

angle of the sun

6–2

checking DC voltage

4–2

effect of shade on performance

6–2

factory ratings

6–1

temperature affecting performance

6–1

types of modules

2–3

voltage requirements

2–3

R

RJ45 ports

communication between inverters

3–13

location in wiring box

3–6

RS-232 port

3–13, 3–15, 5–8

S

safety instructions

vii

serial number

WA–4

specifications

electrical

A–2

mechanical

A–5

standard features and options

1–2

standard test condition

6–1

startup procedure

check PV array DC voltage

4–2

check utility AC voltage

4–2

monitor front panel display

5–1

overview

4–1

replace wiring box cover

4–2

start the inverter

4–3

status LEDs

description

5–11

do not illuminate

6–9

red LED is on

6–9

T

temperature

affecting PV array performance

6–1

range for locating inverter

2–2

terminal blocks in wiring box

3–6

terminators, male network

3–13

thermal derating chart

A–3

torque values for wires

3–7

troubleshooting the inverter

6–9

U

utility disconnect settings

5–3, A–3

W

warranty

out of warranty service

WA–3

terms and conditions

WA–1

weight

A–5

wiring

acceptable wire sizes

A–5

PV array to Xantrex GT Inverter

3–7

torquing

3–7

wire sizes

3–4

wiring box

description

1–3

removing the cover

3–5

removing the inverter from

6–6

RJ45 connectors

3–6

terminal block location

3–6

X

Xanbus technology

3–12

Xantrex web site

v

Advertising