Zj/zr unit dimensions front view, Utilities entry – York ZJ R-410A User Manual

Page 98

Advertising
background image

251934-YTG-G-0708

98

Johnson Controls Unitary Products

ZJ/ZR/ZF180-300 Unit Dimensions

ZJ/ZR Unit Dimensions Front View

NOTE: All entry holes should be field sealed to prevent rain water

entry into the building.

11-1/2

(A) CONTROL WIRING
ENTRY

COIL
GUARD
KIT

CONDENSER
COILS

(B) POWER
WIRING
ENTRY

5

9-3/4

21.00

6-3/8

7-1/8

35

5-7/8

136-1/4

GAS OR ELECTRIC

HEAT

ACCESS

DOT PLUG
(For pressure
drop reading)

BLOWER
COMPARTMENT
ACCESS
(Auxiliary)

(C) GAS
SUPPLY
ENTRY

CONTROL BOX
ACCESS

VENT AIR
OUTLET
HOODS

BLOWER MOTOR

ACCESS (Location

of Optional VFD Bypass)

BLOWER ACCESS

(Location of

Optional VFD)

52-5/8

180-19/32

COMPRESSOR ACCESS

DISCONNECT
SWITCH
LOCATION

ECONOMIZER / MOTORIZED DAMPER
FIXED OUTDOOR INTAKE AIR AND
POWER EXHAUST RAIN HOODS
(See detail Y)

92

46-5/8

35-1/4

33

2-3/4

3-3/4

(B) POWER WIRING
ENTRY

BOTTOM SUPPLY
AND RETURN
AIR OPENINGS
(See Note)

(A) CONTROL WIRING
ENTRY

21-1/2

11-1/8

(D)
GAS SUPPLY
ENTRY

UNIT BASE RAILS

Shown separately to illustrate

RETURN

AIR

Bottom Duct openings. Power

and Gas Piping Connection

location.

NOTE:

For curb mounted units, refer to the curb hanger

dimensions of the curb for proper size of the

supply and return air duct connections.

12-1/2

9-1/4

8-1/8

46-5/8

9-3/4

COMBUSTION
AIR INLET HOOD

SUPPLY

AIR

Utilities Entry

Hole

Opening Size

Diameter

Used For

A

1-1/8” KO

Control Wiring

Front

3/4” NPS (Fem.)

Bottom

B

3-5/8” KO

Power Wiring

Front

3” NPS (Fem.)

Bottom

C

2-3/8” KO

Gas Piping (Front)

1

1. One-inch Gas Piping NPT Required.

D

1-11/16” Hole

Gas Piping (Bottom)

1,2

2. Opening in the bottom to the unit can be located by the slice in the

insulation.

Advertising