Generate a work order, To generate a work order – 3Com Wireless LAN Controller WX2200 User Manual

Page 151

Advertising
background image

Generate a Work Order

151

If the coverage area provided by a MAP on the floor above or below is
one meter or less, 3WXM displays a message. This coverage area is not
displayed on the floor plan.

Generate a Work
Order

You can generate a work order as part of your wireless network
planning. The work order provides all of the necessary information for the
physical installation of the 3Com Mobility System. A work order shows
where the MAPs should be installed, WX initial setup configuration
information, and projected RSSI information that is useful when verifying
the installation.

To generate a work order

1 Display the floor plan in the Content panel.

2 In the Task List panel, click RF Planning.

3 Under RF Planning, click Work Order Report. The Work Order

Generation dialog is displayed.

Advertising