Assembly – Bosch PPS 7S User Manual

Page 42

Advertising
background image

42 | English

1 609 929 W71 | (30.3.11)

Bosch Power Tools

Declaration of Conformity

We declare under our sole responsibility that
the product described under “Technical Data” is
in conformity with the following standards or
standardization documents: EN 61029,
EN 60825-1 according to the provisions of the
directives 2004/108/EC, 2006/42/EC.
EC Type Certification No. MSR 1036 by notified
testing agency No. 0366.
Technical file at:
Robert Bosch GmbH, Dept. PT/ESC,
D-70745 Leinfelden-Echterdingen

Robert Bosch GmbH, Power Tools Division

D-70745 Leinfelden-Echterdingen

Leinfelden, 18.02.2011

Assembly

f

Avoid unintentional starting of the ma-
chine. During assembly and for all work on
the machine, the power plug must not be
connected to the mains supply.

Delivery Scope

Please also observe the represen-
tation of the delivery scope at the
beginning of the operating instruc-
tions.

Before starting the operation of the machine for
the first time, check if all parts listed below have
been supplied:
– Pull Push Saw

(Mounted: Saw blade 28, insert plate 5)

– Universal Guide 1
– Rotary knob 38 for locking the universal

guide

– Laser unit 41
– Fastening kit for “laser unit” 42

(Allen screw, nut)

– Blade guard 3
– Fastening kit for “blade guard” 43

(Socket bolt, wing nut)

– Batteries (2x, size LR03, 1,5 V)
– Table extension 27 with support leg 49
– Fastening kit “for table extension ”48

(rotary knob 52, socket bolt, nut)

– Push stick 12
– Allen key 13
– Bottom plate 39 with pre-mounted Allen

screws

Note: Check the power tool for possible dam-
age.
Before further use of the machine, check that all
protective devices are fully functional. Any light-
ly damaged parts must be carefully checked to
ensure flawless operation of the tool. All parts
must be properly mounted and all conditions
fulfilled that ensure faultless operation.
Damaged protective devices and parts must be
immediately replaced by an authorised service
centre.

Initial Operation

– Carefully remove all parts included in the de-

livery from their packaging.

– Remove all packaging material from the ma-

chine and the accessories provided.

– Take care that the packaging material under

the motor block es removed.

Assembly Sequence
For easier working, observe the assembly se-
quence of the supplied product features.
1. Assembly from Below
– Bottom plate 39 with pre-mounted Allen

screws

2. Assembly from Above
– Inserting the Batteries;

Attaching the Laser Warning Label

– Laser unit 41
– Blade guard 3
– Adjusting the Laser
– Table extension 27
– Universal guide 1 and fence 36

Dr. Egbert Schneider
Senior Vice President
Engineering

Dr. Eckerhard Strötgen
Head of Product
Certification

OBJ_BUCH-1259-002.book Page 42 Wednesday, March 30, 2011 11:02 AM

Advertising