System testing and setup – Banks Power Universal Car & Truck: (Gas or Diesel ’50 - 14 Universal) Water-Methanol: Straight-Shot and Double Shot, Universal applications User Manual

Page 19

Advertising
background image

97650 v.1.0

19

8.

Fasten all other connectors and termi-

nals (power supplies, ground leads, etc.) of

pump and signal harnesses to appropriate

locations, using system schematics for

reference. Secure wiring with tie wraps.

System Testing and Setup

: Use “MENU” button on

injection controller to scroll through

a menu and “SELECT” button to

choose a menu option. See injection

controller menu flow chart (pages

16-17) for an overview of controller

menus.

: This section of the

manual will walk you through the

initial purging and pressure test pro-

cess to ensure that your installation

is clean and leak-free. It is critical

to safe system operation that each

step be followed in order, and that

any leaks are corrected before vehi-

cle operation.

1.

Fill windshield washer fluid reservoir

or high capacity tank with distilled water.

2.

Turn vehicle ignition to on without

starting the vehicle. The injection con-

troller screen should light up and scroll

“BANKS POWER” along with the controller

software version number.

3.

Remove tubing from each injection

nozzle assembly by pressing in the collar

of the push-lock fitting and gently pulling

on tubing. Place end(s) of tubing into a

clear container of suitable size (the high

volume pump can move more than a

gallon of water a minute) and secure con-

tainer in a stable position.

: Tubing must be

disconnected from injection nozzle

assembly while priming pump, oth-

erwise water could flood and dam-

age engine.

4.

Temporarily disconnect the pump pres-

sure switch connector from the signal

harness, or remove one pump pressure

switch lead from the pump. Now, the sys-

tem may be primed and purged by using

the injection controller’s “TEST” mode. To

activate “TEST” mode:

4a.

Scroll through the main menu by

pressing the “MENU” button. Press the

“SELECT” button to select the “OCTL”

(output control) sub-menu.

4b.

Scroll through the “OCTL” sub-menu

by pressing the “MENU” button. Press the

“SELECT” button to select and activate

“TEST” mode. Any connected solenoids

will open, the pump will turn on and run

at 50% duty cycle for 6 seconds, and then

turn off automatically. Let the test mode

run until water flows out of tubing into

clear container, and then turn it off by

selecting “OFF” from the “OCTL” menu.

Figure 41

Figure 40

Advertising