Assembly – Grain Systems Bucket Elevtors, Conveyors, Series II Sweeps PNEG-970 User Manual
Page 26
Advertising
![background image](/manuals/277552/26/background.png)
PNEG-970 S2 Hopper w/ Collector Ring
26
Assembly
3. WIRE THE COLLECTOR RING TO THE SWEEP (cont.)
F.
Wire the nine (9) stranded wires to the junction boxes in the following manner.
1. Thermal Protection Leads
a.
Wire the "P1" lead from both motors to "1".
b.
Wire the "P2" lead from both motors to "2".
2. Drive Motor Leads
a.
Wire the three (3) power leads to "3", "4", and "5".
b.
Wire the ground lead to "9".
3. Auger Motor Leads
a.
Wire the three (3) power leads to "6", "7", and "8".
b.
Wire the ground lead to "9".
Advertising