6. Installation

66

PNEG-1095 FCDL 4.00" Corrugation Externally Stiffened Grain Bin

Wind Ring Installation

1. Sidedraw systems may require additional

wind rings. They must be attached at the
beginning of assembly because they go
on the upper most rings.

(See Wind Ring

Requirements Chart.)

2. To connect wind ring pipe to the stiffeners,

field drill 3/8'' holes through the flange of the
stiffener.

(See Figure 6W.)

3. Attach wind ring pipe section to stiffener using

two (2) 3/8" x 2-1/2" U-bolts and nuts.

(See Figure 6W.)

4. Connect section of wind ring pipe to the first

section by sliding the male end into the female
end of pipe. Fasten together using two (2)
wind ring couplers and six (6) 3/8" x 1"
flanged head bolts with nuts. Couplers should
be centered on the seam of pipes.

(See Figure 6W.)

5. Sidedraw wind ring used in conjunction with

standard wind ring is placed in the 4

th

ring.

Standard sidedraw wind ring is placed in the
2

nd

ring.

Figure 6W

Figure 6X

Standard Wind Ring Placement (Ring #)

Rings

42'

48'

54'

60'

13

-

-

2

2

14

2

2

2

-

Wind Ring Requirements

Rings

30'

33'

36'

42'

48'

54'

60'

10

--

--

1

1

1

1

1

11

--

1

1

1

1

1

1

12

1

1

1

1

1

1

1

13

1

1

1

1

1

1

1

14

--

--

--

1

1

1

--

NOTE: Wind rings must be installed
in relation to the ladder rungs as
shown here to ensure compliance
with O.S.H.A., regulations.