Hopper collar assembly, Hopper assembly – Grain Systems Tanks PNEG-1461 User Manual

Page 80

Advertising
background image

12. Hopper Assembly

80

PNEG-1461 12', 15', 18' and 21' Bulk Feed Tank Series and Grain Hopper Tank Series

Hopper Collar Assembly

45° 22" Hopper collar (BLK-10854)

60° 22" Hopper collar (BLK-10342)

Install hopper collar before all hopper panels are assembled. Use 5/16" truss head bolts on all hopper
seams, as shown in the

Figure 12H

. Be sure to caulk between the hopper collar and hopper panels. Refer

to

Figure 12I

and Figure 12J on Page 81

.

16" 45° Hopper extension panel (BLK-10697) (three (3) required)

16" 45° Hopper collar (BLK-10696)

16" 60° Hopper extension panel (BLK-10487) (three (3) required)

16" 60° Hopper collar (BLK-10489)

Prior to attaching the final hopper panel, assemble the hopper extensions (if utilized) on the hopper collar.
Use 5/16" truss head bolts and caulk all joints on the hopper extensions and collar. After completing this
assembly, attach to the hopper panels, using 5/16" truss head bolts. Be sure to caulk between hopper
extensions and hopper panels.

(See Figure 12I and

Figure 12J on Page 81.)

Figure 12H Hopper Seam Overlap Detail

Ref #

Description

A

5/16" x 3/4" Truss Head Bolt

B

Flange Nut

C

Caulking (Two (2) Strips)

Bolt head to be on inside of hopper.

Advertising