Platform installation – Grain Systems PNEG-349 User Manual
Page 13
Advertising
13
Service Platform & Stiffener
PLATFORM INSTALLATION
Figure 15: Connecting outer front toe board to guard rail support channels.
Figure 16: Connecting left-hand front toe board to guard rail support channel.
Platform Toe Board
Angles And Flooring
Use 5/16" x 3/4" bolts and install the
platform floor toe board angles.
When two toe boards are listed, the
bottom toe board must be positioned
to capture the floor panels. The ad-
ditional upper toe board acts as a
narrow foot rail to provide added
safety protection. When connecting
upper toe boards, install bolts so the
head ends are located within the plat-
form. The long flanges of the toe
boards point up.
Advertising