Platform installation – Grain Systems PNEG-349 User Manual

Page 13

Advertising
background image

13

Service Platform & Stiffener

PLATFORM INSTALLATION

Figure 15: Connecting outer front toe board to guard rail support channels.

Figure 16: Connecting left-hand front toe board to guard rail support channel.

Platform Toe Board

Angles And Flooring

Use 5/16" x 3/4" bolts and install the
platform floor toe board angles.
When two toe boards are listed, the
bottom toe board must be positioned
to capture the floor panels. The ad-
ditional upper toe board acts as a
narrow foot rail to provide added
safety protection. When connecting
upper toe boards, install bolts so the
head ends are located within the plat-
form. The long flanges of the toe
boards point up.

Advertising