Platform installation, Platform guard rails – Grain Systems PNEG-349 User Manual

Page 17

Advertising
background image

17

Service Platform & Stiffener

PLATFORM INSTALLATION

Platform Guard Rails

Use 5/16" x 3/4" bolts and install plat-
form guard rails within platform pack-
age # 4. Guard rails should be installed
so that the smooth rail surfaces and
bolt heads are within the compartment
to provide maximum body protection
from corners and angle edges.

1. Connect the upper side guard

rail onto each side.

2. Connect the upper front guard rail.

3. Connect two rear guard rails

onto each rear side of platform.

4. Connect two lower front guard rails.

5. Connect the lower front side

guard rail, and the lower rear
side guard rail onto each side
platform. Connect the access
door clip on the left side of the
platform.

6. Fully tighten all guard rail bolts,

including the seven guard rail
support channels not tightened
earlier.

Figure 22, top: Installing front and

side upper guard rails. Figure 23,

above: Installing lower side guard

rails. Figure 24, right: Installing

lower rear guard rail.

Advertising