2 ring door installation, Installation – Grain Systems Tanks PNEG-1094 User Manual

Page 47

Advertising
background image

6. Installation

PNEG-1094 Farm Grain Bin - 4" Corrugation

47

2 Ring Door Installation

Before starting to install, be sure the correct door has been received.

(See Chart on Page 47.)

Note that

1 ring doors are standard with some sizes of bins/silos. Refer to

Page 53

for round access door

installation instructions.

2 Ring Door Installation Instructions

(See Figure 6V on Page 48.)

1. Remove inner door panels (19-21) and outer door cover (1). Apply double row of rope caulk along

door flanges, noting how door and bin sheets lap. The top of the door frame goes to the inside of
the sidewall and the bottom of the door frame goes to the outside of the sidewall sheet. With inner
door panels and outer door cover removed, set door frame into opening. Insert a bolt at the four (4)
corners of door frame and sidewall, but do not tighten until completing

Step 2

.

2. Re-install inner door panels (19-21) at original locations. Close latch bars (12) to lock panels in place.

Be sure that panels are fully seated over all bearing pins (17). Install inner panel hinge assemblies
(8-10) per illustration instructions with hinges.

NOTE: Do not distort door frame with use of alignment or drift punches - if necessary, drill or ream

holes to insert bolts in door frame. Now tighten frame bolts starting at center and working
toward top and bottom on each side.

3. Keep inner panels latched and loosen all bearing pin bolts (17). Re-tighten all bearing pin bolts. This

makes loading on pins uniform for easier operation of panels.

4. If some latch bars (12) are loose or require excessive force to lock, loosen hex socket cap screws

and adjust in or out until latch bars operate smoothly. Check that the panels are fully seated over all
bearing pins.

5. Re-install outer door cover (1). Adjust outer door hinges and latches as required.

6. Assemble door hold back as shown in

Figure 6V on Page 48

. Open door cover (1) until it approaches

the bin wall. Hook retaining bracket (5) over lower latch (2) mount and position the door hold back
bracket (24) against bin wall in a valley. Drill a 3/8" hole through the bin wall and bolt the door hold
back bracket (24) to the bin. If needed, install the door hold back extension (25) to door hold back
bracket (24).

Figure 6U 2 Ring Door Installed

4.00" Corrugation

WD-6241

12'-27' Bins/Silos

WD-6245

WD-6242

30'-42' Bins/Silos - Maximum height of
9 rings

WD-6246

48'-Maximum height of 8 rings

WD-6244

48'-Bins/Silo - 9 rings

WD-6248

Optional Auger Hood - 2 Ring

WD-6243

12'-24' Bins/Silos - with auger hood panel

WD-6247

Advertising