Unpacking and inspection – Net Optics 10_100_1000BaseT Tap User Manual

Page 7

Advertising
background image

Gig Zero Delay Tap & 10/100/1000BaseT Tap

4

About This Guide

This guide explains how to install the Gig Zero Delay Tap and the

10/100/1000BaseT Tap. Please read the Guide before attempting to install

the device.

This guide covers the following models:
• TP-CU3-ZD

10/100/1000 Tap with Zero Delay

• TP-CU3-ZD-DC 10/100/1000 Tap with Zero Delay, -48V DC power

• TP-CU3

10/100/1000 Tap

• TP-CU3-DC

10/100/1000 Tap , -48V DC power

Unpacking and Inspection

Carefully unpack the Gig Zero Delay Tap and check for damaged or missing

parts. The Tap ships with the following:

• (1) Tap device

• (2) power supplies (TP-CU3-ZD and TP-CU3 only)

• (2) power cords (TP-CU3-ZD and TP-CU3 only)

• (1) retainer clip (TP-CU3-ZD and TP-CU3 only)

• (1) network cable, 3 meter, straight-through (purple)

• (1) network cable, 3 meter, cross-over (green)

• (2) monitor cables, 3 meter, straight-through (purple)

• (1) Installation Guide

You may have also ordered a panel for rack mounting and an extended warranty.

Carefully check the packing slip against parts received. If any part is missing or

damaged, contact Net Optics Customer Service immediately.

Warning! ____________________________________________________________

For the TP-CU3-ZD and TP-CU3 models, use only the power supplies pro-

vided by Net Optics for use with this product. Use of other power supplies may

result in a safety hazard that could cause damage or injury.

_______________________________________________________________________

Advertising