3 commissioning, 1 scope of delivery, 2 initial commissioning – Xylem COND3110 HANDHELD CONDUCTIVITY METERS User Manual
Page 13: 1 inserting the batteries, Commissioning, Scope of delivery, Initial commissioning 3.2.1, Inserting the batteries, 3commissioning
Advertising

Cond 3110
Commissioning
13
ba75792e02
11/2008
3
Commissioning
3.1
Scope of delivery
z Conductivity meter Cond 3110
z 4 batteries 1.5 V Mignon type AA
z Operating manual
3.2
Initial commissioning
Perform the following activities:
z Insert the supplied batteries
z Switch on the meter.
3.2.1
Inserting the batteries
Note
Alternatively, you can also use Ni-MH rechargeable batteries (type
Mignon AA). In order to charge the batteries, an external charging
device is required.
1
Unscrew the two screws (1) on the underside of the meter.
2
Open the battery compartment (2) on the underside of the
meter.
3
Place four batteries (type Mignon AA) in the battery
compartment.
2
1
Advertising