Caution, Attention – Elmo Rietschle L-BV5 Operating instructions User Manual

Page 16

Advertising
background image

Installation

610.44440.40.000

16 / 32

© Gardner Denver Deutschland GmbH

5.2.1 Connecting the suction and discharge

connections

CAUTION

If the unit is connected to a vacuum tunnel
the operating-liquid can be drawn out of the
unit into the system risking damage to the
system.
 Fit a check valve in the suction line.

CAUTION

The tightening torque for piping connections to
the suction and discharge connections may not
exceed 100 Nm [73.8 ft lbs]!

CAUTION

When attaching pipelines / hoses, make sure
that these are free from mechanical stresses.

CAUTION

In the case of gases / vapours containing
impurities:
 if necessary a filter, strainer or separator

should be installed in the suction line.

CAUTION

In order to prevent residues left over from instal-
lation work (e.g. welding beads) entering the
unit, an intake strainer should be fitted in the
suction line for the first 100 operating hours.

Connection sizes, suction / discharge connec-
tions
Type

Connection

2BV2 06.

Threaded end G1

2BV2 07.

Threaded end G1

1

/

2

2BV5 11.

Flange 50 ND10-DIN 2501 or
ANSI-B16,5-2-150
Gasket DN50 PN40 DIN EN 1514-1
form FF

2BV5 12.
2BV5 13.

Flange 65 ND10-DIN 2501 or
ANSI-B16,5-2 1/2-150
Gasket DN65 PN6 DIN EN 1514-1
form FF

2BV5 16.

Flange 80 ND10-DIN 2501 or
ANSI-B16,5-3-150
Gasket DN80 PN6 DIN EN 1514-1
form FF

2BV5 410

Flange 50 ND10-DIN 2501 or
ANSI-B16,5-2-150
Gasket DN50 PN40 DIN EN 1514-1
form FF

The inlet connection (item 8, page 3) is marked
with an arrow pointing downward. The gases /
vapours are drawn inward in this direction.

 Connect the system suction line.

The discharge connection (item 7, page 3) is
marked with an arrow pointing upward. The
gases / vapours as well as the operating-liquid
are expelled in this direction.

 Connect the system discharge line.

5.2.2 Making the operating-liquid connec-

tion

CAUTION

In the case of operating-liquid with impurities:
 if necessary a filter, strainer or separator

should be installed in the supply line.

ATTENTION

If the operating-liquid is highly calciferous:
 soften the operating-liquid
OR
 decalcify the unit regularly (chapter 9.1,

"Maintenance", page 26).

Connection sizes, operating-liquid inlet
Type

Connection

2BV2 0

Threaded tapping G

3

/

8

, 12 mm deep

2BV5 1
Cast iron

Threaded tapping G

3

/

4

, 24 mm deep

2BV5 1
Stainless
steel

Threaded tapping G

3

/

4

, 24 mm deep

OR
flange in accordance with
EN 1092-PN40-DN15 and
ANSI-B16.5-1/2-150

2BV5 410

Threaded tapping G

3

/

4

, 24 mm deep

 Connect the operating-liquid supply line to the

operating-liquid inlet (item 6, page 3).












Advertising
This manual is related to the following products: